KSTAR 320MW Water-based Solar project in East China
KSTAR 320MW Solar-water Power Plant in East China is divided into 2 phases, one is 200MW, and the other is 120MW.
For the phase I of the big project (FIT is 0.85 RMB), it is 200MW installation with a total investment 250 million USD at Zhouxiang reservoirs in Cixi. The plant has been operational stably and safely for more than three years at a solar-water Power Park, and it is the largest solar-water park in China.
The second phase of a 320 MW project starts to generate electricity since Dec 30,2019,whose subsidy is 0.095 RMB kwh and the total investment of Phase 2 is 100 million USD.
The Zhouxiang reservoirs at Cixi are very large with fishes and shrimp farming ,covering nearly 300 hectares, and the widen surface is very suitable for the installation of large-scale solar power plant. Near the reservoirs, the transportation is very convenient. Besides,the area is located in the subtropical region with a monsoon climate.The annual average temperature is 16.0℃,and the highest of the average is 28.2 in July,℃, the lowest temperature is 3.8℃. There is sufficient rainfall, with an annual average rainfall of 1272.8mm. The peak month of precipitation is September, accounting for an average of 14% of the annual rainfall.
The environment is a challenge for PV manufacturers, but for KSTAR, its flexible turnkey solutions provide higher yields, safety and reliability for the whole project. The operating temperature range of the inverters is –40℃~+60℃(More than 50℃ derating).